Shuttle Music Player 1.6.7 is the latest version of Shuttle Music Player from
SimpleCity. Shuttle Music Player is on of the most popular Music & Audio Apps on Google Play Store, and here you will be able to download the Shuttle Music Player 1.6.7 APK file with direct download links. If your Android Smartphone doesn't have Play Store App such as Chinese Smartphones from SAMSUNG, or even for any other reasons you are looking for Shuttle Music Player 1.6.7, then you will have no problem because you can download the APK file from a trusted and safe server directly to your PC or your Android Smartphone.
Shuttle Music Player 1.6.7 Screenshots
What's new in Shuttle Music Player 1.6.7
- Fixed an issue where searching didn't work very well for songs/albums/artists with multiple words in the name.
- Fixed an issue where inverted notification icons aren't visible.
- Fixed a crash when choosing to invert icons on API < 21. This feature is no longer available on such devices.
- Fixed an issue where songs with no album tag information ended up being grouped under one artist.
- Added accessibility content descriptions to notification buttons.
- See changelog for more.
Shuttle Music Player 1.6.7 App info
| Package Name | another.music.player |
| Android Version | Min: Android 4.1 (Jelly Bean, API 16)
Target: Android 7.1 (Nougat MR1, API 25) |
| App Version | 1.6.7 |
| File Size | 5.22 MB (5,470,250 bytes) |
| Supported DPIs | nodpi |
| MD5 Signature | 90935ed251dff3739cc2b4343bb2fbdb |
| Installs | 1,000,000 - 5,000,000 |
Shuttle Music Player 1.6.7 Download
Hope you enjoy using Shuttle Music Player 1.6.7 . Feel Free to share this App with your friends using the share buttons below.